The first thing you need to do when figuring out how to put shingles on a roof is to determine which type of roofing shingles you need.
How to tie roll roofing into a shingle roof.
The big idea is that layers of the lower roof should sit below corresponding layers of the upper roof.
This was a repair for a residential home in strathroy ontario the client had a flat roof and shingle roof section that tied into each other.
The flashing should double lap the roll roofing.
Place the first layer of rolled roofing on the roof.
3 tab shingles are the most common type of shingle they are typically 36 inches long in total.
This video shows the transition of a shingle roof to a metal roof.
String the line along the top of the frame until it meets the shingle roof.
The first layer should cover the roof as far as the chalk line.
A very important detail is where the flat roof is connecting the pitch roof.
Dbower for a roof that new tinner pretty much summed it up.
The felt and rolled roofing material is tucked up underneth the shingels of the house so when it rains the water runs down the top of the roof and right onto the porch roof.
Push the rolled roofing down into the wet cement to secure it to the roof.
Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
If the deck you are tying into is 10 squares there s no reason to replace the whole thing when you can get by with one square.
Roofing nails to the existing structural sheathing.
The most trusted miami roofing contractor professionally describes the installation of thi.
Carefully remove the shingles 2 3 feet out from where your valley will be tying in.
It was a small.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
The problem is that the porch roof doesn t go under the eves or to the peak of the existing house it ties into the 4 12 roof about half way up.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.