1 2 inch 1 3 cm plywood or osb are common substrates and these are generally covered with roofing felt or another moisture barrier prior to siding the walls.
How to start vyinl siding.
Unless already installed a water resistive barrier should be applied to the house prior to installing vinyl siding.
Consult your local.
Vinyl siding starter strips.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
Aviation tin snip start cutting at the top interlock and continue toward the bottom of the panel.
All vinyl siding and vinyl soffit and fascia can be cut with tin snips a circular saw with a plywood blade or by scoring it with a knife and breaking it.
Not just another vinyl siding installation video.
When installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
You need to leave at least 1 4.
This is where the new siding will begin.
Install flashing before starting to apply the siding.
Utility knife score panel with knife then bend the vinyl back and forth until it snaps cleanly on the scored line.
If you don t cut your siding short when it expands in the summer it s going to buckle.
A flat level wall surface is necessary for proper installation of vinyl siding.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Siding panels should be nailed 12 in.
Remove any siding or exterior finish that isn t compatible with vinyl siding and make sure the walls are sheathed with a substrate to receive the siding.
This is our most comprehensive.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Power saw bench or radial arm saw.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
Refer to important notes for more information on water resistive barriers.